London sewers date back in part to the turn of the last century. A rise in the amount of rainfall, coupled with the type of sewer construction and the position of building sewage connections, increasingly results in back pressure and flooded cellars. Compli sewage lifting stations provide back pressure protection and prevent flooding.
Backpressure protection along river thames
Used pump technology
Sewage lifting stations
2.400 x compli 400
600 x compli 1010
Flow rate compli 400: Qmax = 48 m³/h / Delivery head: Hmax = 6 m
Flow rate compli 1010: Qmax = 52 m³/h / Delivery head: Hmax = 6 m